Karara, Filter building
Basic and detail engineering
Engineering was performed in a single stage over 4 months, with challenging customer requirements regarding connection detailing. Despite the compressed schedule, all engineering deliverables were completed while maintaining compliance with the project specifications and applicable design standards.
Scope of work
- Structural engineering
Documentation produced
- Calculation reports
- GA drawing
- Assembly drawings
Engineering support.
The production of the steel structures was carried out in China. As a result, the majority of the connection types had to be redesigned at the final stage on short notice to accommodate fabrication constraints and optimize manufacturability.
Key challenge.
Due to the challenging support requirements of the main equipment, several iterations of the main frame structures were carried out in order to reduce the loads on the foundations. Close cooperation with the client and equipment suppliers enabled the structural concept to be optimized without compromising safety, functionality, or the project schedule.







Looking for an engineering partner who takes responsibility?
Let’s discuss your next project.
Start with a technical discussion.
No sales pressure.